ACCA P3 考試:PERFORMANCE INDICATORS 4
PERFORMANCE MEASURES-A PRACTICAL FRAMEWORK
Expanding on the last point, above, to establish a performance measurement system, something like the following is needed for each measure:
1.A meaningful title of the measure
2.What is its purpose and how does that purpose relate to strategic success?
3.What other performance measures might be affected by this one, how are they affected and how are conflicts to be resolved?
4.Who will be held responsible for it?
5.What is the source data, who is responsible for its supply, how is it measured and how is the measure calculated?
6.What investigations and explanations are required and who is responsible?
7.What target is set and how has that target been determined?
8.How often should the target be updated?
9.How often is the measure reported on?
10.Reporting and action?
For example, consider a passenger train company called TTTE:
1.Title of performance measure
|
Punctuality (the percentage of trains arriving at their destination on time).
|
2.Purpose of performance measure
|
TTTE’s strategic objective is to provide comfortable, reliable and punctual services to passengers. TTTE competes with other train companies, cars, buses and airlines. Punctuality is seen as a key competitive lever and therefore must be measured.
|
3.Other performance measures affected
|
Safety – safety checks and speed limits will take priority over punctuality
Cleanliness – it might be necessary to occasionally reduce cleaning to keep to the timetable. Energy consumption running a train faster than normal (though within speed limits) will cause higher fuel consumption but punctuality takes precedence. |
4. Who is held responsible?
|
Operations director.
|
5.Source data, measurement and calculation of the measure.
|
The duty manager at each station is responsible for logging the arrivals time of each train. A five-minute margin is allowed ie a train is logged ‘on time’ if it is no later than 5 minutes after the advertised time. Beyond five minutes the actual time by which the train is late is logged. Results will be calculated in percentage bands: on time, up to 15 minutes late, >15–30 minutes late, >30 minutes – one hour late, >one hour late, and so on.
|
6.Investigations and explanations
|
While logging late arrivals, station duty managers should also note the cause where possible. The operations director must collate this information using statistical analysis which highlights persistent problems such as particular times of the day, routes or days of the week.
|
7. Target and how it is determined
|
The target is dictated by the railway timetable. The timetable should be reviewed twice a year to look for ways of reducing journey times to keep TTTE competitive with improvements in competing transport.
|
8. Update of target
|
The banding and any tolerances will be updated annually.
|
9. How often should the measure be reported
|
Weekly
|
10. Reporting and action
|
The operations director will report performance on a monthly basis to the board together with plans for service improvement.
|
歷年樣卷
考試大綱
詞匯表
報考指南
考官文章
思維導(dǎo)圖
安卓版本:8.7.50 蘋果版本:8.7.50
開發(fā)者:北京正保會計(jì)科技有限公司
應(yīng)用涉及權(quán)限:查看權(quán)限>
APP隱私政策:查看政策>
HD版本上線:點(diǎn)擊下載>
官方公眾號
微信掃一掃
官方視頻號
微信掃一掃
官方抖音號
抖音掃一掃
Copyright © 2000 - galtzs.cn All Rights Reserved. 北京正保會計(jì)科技有限公司 版權(quán)所有
京B2-20200959 京ICP備20012371號-7 出版物經(jīng)營許可證 京公網(wǎng)安備 11010802044457號